separating work from home

£6,995 Assembled*

taking pre-order interest now

* We assemble onto a provided base (2.4m x 2.4m)

REGISTER INTEREST

Our affordable garden rooms come with app controlled heating and lighting, insulated walls, and we’ll fit it for you on your concrete or slabbed base

… giving you a dedicated work area, that facilitates the separation of home and work

Specification

INSTALLATION

• No planning permission or building regulations required*

• You supply a paved base (similar to a shed base) and mains power supply**

• We install in 1 day

• Our modular system enables us to transport the all components through a house where no external garden access is available

EXTERIOR

• 2.4m x 2.4m external footprint

• Mineral wool insulated steel framed walls

• Anthracite (black) composite woodgrain effect cladding

• Anthracite uPVC Patio door with double glazing

• Single ply membrane roof

• External double power point

INTERIOR

Dark oak laminate flooringMatt white faced wall & ceiling panels

• Smart lighting, with 4 spot LED down light on track with app control***

• Cürv Smart radiant heat panel with thermostat and app control***

• 2x double electrical sockets

• 3-way RCD electrical consumer unit

*Excluding conservation areas, listed buildings and national parks.  Please check with a professional before purchasing a garden room.
** Power supply to be installed by a qualified electrician who can provide the required certifications for your home.
*** Smart functionality requires WiFi connection with internet - not supplied.

Register interest in a Garden HQ Garden Room

We expect to commence deliveries in early 2022. To keep up to date with our progress to launch, please fill out your details below to join our mailing list.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Articles & Updates

Frame Assembly Complete

A fully assembled frame has been completed and undergone initial testing.

Read more...

August 16, 2021

Keep Work Separate From Home

The Royal Society for Public Health said over half those working from home were struggling to switch off.

Read more...

August 11, 2021

Production Starts on Revised Prototype

We are exciting to announce that construction has commenced on our initial unit.

Read more...

July 26, 2021